-
Park Hill Denver Heat Pump & Furnace Retrofit Case Study

The existing HVAC system—an 18-year-old single-stage York furnace with 80% AFUE and electric resistance backup—was failing with high utility bills, uneven comfort across floors, and frequent repairs. Antonio conducted a comprehensive energy audit using multiple diagnostic tools: Blower Door Test: Using an Energy Conservatory DM32 differential manometer, the home showed a leakage rate of 8,400…
-
Emergency Medical Center Boiler Replacement & Redundancy – Denver Case Study

This medical center operates as a 250-bed acute care teaching hospital serving the Denver metro area. The facility maintains 24/7 critical care operations across 450,000 square feet, including 180 patient rooms, two operating theaters, a 24-bed ICU, emergency department, diagnostic imaging centers, and administrative offices. In early October 2024, the hospital’s facilities management team discovered…
24/7 MATCHING SERVICE
Emergencies don’t wait. Neither do we. We’ll connect you to a trusted Denver pro anytime—day or night.

